JS-Electrical
JS-Electrical

Project

EV Charger Installation in Dore

Zappi EV charger installed on brick wall

Project Overview

This Dore homeowner approached us looking to future-proof their Victorian terrace with a smart EV charging solution. With solar panels already installed, they wanted a charger that could intelligently use surplus solar energy.

The Challenge

  • Period property with limited external cable routing options
  • Existing consumer unit needed upgrading to handle the additional load
  • Homeowner wanted seamless smart home integration

Our Solution

We installed a Zappi 7kW charger with full solar integration capabilities. The installation included:

  • Supply Upgrade: Upgraded the main fuse to 80A to accommodate the charger
  • Discrete Cable Routing: Carefully routed the supply cable through the property to minimise visual impact
  • Smart Integration: Connected the Zappi to the existing solar system for intelligent eco-charging
  • OZEV Grant: Handled all paperwork, saving the client £350

Results

The homeowner now charges their Tesla Model 3 predominantly using surplus solar energy during the day, reducing their charging costs by approximately 70%.

"James handled everything from start to finish. The installation was clean, professional, and the paperwork for the OZEV grant was all taken care of. Highly recommend!" — David M., Dore